Karapınar Energy Industry Zone
Another factor that makes our region most suitable is, for sure, ready infrastructure and available land facilities to energy investments. There are large and nonarable lands in Konya, especially in Karapinar. 59.586.876 square meters of area that has been declared as Industrial Zone Specialized in Energy which will be given further incentives in addition to the current incentive system, will be available to investors. The installed capacity of region's potential for solar power plants is 4000 MW. The Power Substation which will be connected by the manufacturers is at the border of the declared land. With the investments in the region, we think that in an area of 1 m², between 60 KWh and 90 KWh of energy could be produced annually. This amount of energy production per square meter can bring annualy the minimum income of 8 USD/m2/year. When compared to similar places, this area has approximately U.S. $ 10 billion economic value.
Properties Of Location
Investment Criteria |
Parameter |
Karapınar |
Location of Area |
Annual Total Sunshine Duration |
2.964 hour / year |
Annual Solar Radiation |
2.100 kWh/m2year |
|
Climate Charecteristics |
Low atmospheric density |
Open (02 okta) |
Distance to Riverbeds |
There is not river |
|
Low air polution |
Very low |
|
Low wind potential |
5,5 meter/sec/year |
|
Arid climate |
Semi arid, Cold |
|
Low Humidity |
21% |
|
Distance to Sea |
265 km/Akdeniz |
|
Low air temperature |
11,83 C° |
|
Positional Properties Of Location |
Inclined terrain |
1,5 ° |
Land without the risk of earthquakes |
5. Degree |
|
Land has not been protected by law |
Yes |
|
Non forest land |
Yes |
|
Non agriculture land |
Yes |
|
Non pasture land |
Yes |
|
Railway, highway land not exceeding |
Yes |
|
Not close to the airport land |
110 km |
|
Military exercises in the field, away from the land |
Enough distance |
|
Away from the urban area of land |
Enough distance |
|
Away from the main roads and the coastal strip of land |
Yes |
|
Land is not lookup field for mining or oil |
Yes |
|
Distance to Altitudes |
Yes |
|
The land away from the direction of bird migration |
Enough Distance |
|
Other Issues |
Obstacle to investment license |
There is no obstacle to invesment license |
Transformers and Transmission Constraints |
100 MVA Transformer and |
|
200 MW Transmission Capacity |
||
Incentives |
Customs Duty Exemption, |
|
VAT Exemption, |
||
Land Allocation, |
||
Social Security Premium Support |
||
(Employee’s Share) , |
||
Tax Reduction |
||
Tax Incentives ın Industrial Zones |
Working |
|
Qualified Human Resources |
52 person/km2, |